It builds plans for the group's projects, such as room renovations, hotel openings and rebrands, and rolls out new property systems, with phases, milestones, owners and the rooms taken out of order for each phase. It proposes a baseline with contingency, flags clashes with peak dates and group commitments, and records the baseline in the project tracker once the sponsor approves.
How it works
7 steps, and a person signs off before step 7.
- 01Looks it up
Finds the record the request is about in the project tracker: the current plans, milestones and owners for the hotels named, with the PMS out-of-order rooms and the sales and catering system's group blocks for the same dates..
- 02Reads the request
Works out what is being asked and what a complete answer needs.
- 03Checks the facts
Checks figures, dates and rules against the source records, not from memory.
- 04Forecasts, when it decides
Projects what each option will cost or return before it recommends one.
- 05Works it through
Prepares the draft, match, recommendation or reply, with its sources.
- 06Asks a person
Hands the work to General Manager with its reasoning before anything goes out.
- 07Acts
Once approved, it acts in the project tracker: it creates or updates the project baseline with its phases, milestones and owners. and records what was done.
What it works with
Your knowledge, your systems, your people.
Knows
The project delivery standard: phase templates for renovations, openings and system rollouts, the out-of-order room rules, peak-date calendars, contingency rules and the health and safety sign-offs each phase needs.
Reads from
the project tracker: the current plans, milestones and owners for the hotels named, with the PMS out-of-order rooms and the sales and catering system's group blocks for the same dates.
Acts in
the project tracker: it creates or updates the project baseline with its phases, milestones and owners.
Hands back
An object with phases (a list, each with name, start, end, owner, rooms_out_of_order and milestones (a list, each with name, date and inspection_required)), critical_path_days, contingency_days, forecast_finish (YYYY-MM-DD), displaced_room_nights, clashes (a list, each with date, what and with) and risks (a list of short strings).
Asks a person when
The plan misses the target date once contingency is added, a phase takes more than 10 percent of rooms out of order, work falls on a peak date or a group's dates, or a milestone moves more than 10 days.
Settings
Your limits, set by your managers.
| Setting | Default | What it controls |
|---|---|---|
| Contingency added to the plan (%) | 15 | Added to the critical path as a buffer before the target date. |
| Most rooms out of order at once (% of inventory) | 10 | A phase taking more of the hotel's rooms out of order than this at once needs the Revenue Manager's view of displaced revenue. |
| Milestone move that needs re-baselining (days) | 10 | A milestone that slips by more than this needs the sponsor to approve a new baseline. |
| Keep disruptive work out of peak periods | On | When on, noisy or out-of-order work is never scheduled on the peak dates in the calendar. |
| Longest task before it is split (days) | 10 | Tasks longer than this are split into smaller tasks with their own owners. |
| Milestone template | renovation | The phase and milestone template the plan starts from. |
Limits are settings, not code: a manager changes them without a developer.
Rules it always follows
- Start from the renovation template and keep its mandatory milestones, including fire, life-safety and health inspections before rooms return to sale.
- Add 15 percent contingency to the critical path; a plan that misses the target date with contingency is shown as at risk, never squeezed silently.
- No phase takes more than 10 percent of the hotel's rooms out of order at once without the displaced room nights and revenue shown.
- While on is true, no noisy or out-of-order work falls on a peak date or on nights with a definite group block.
- Split any task longer than 10 days, and give every task one owner.
- A milestone moving more than 10 days needs the General Manager to approve a new baseline.