- Industry
- Insure AI
- Department
- Finance
- Team
- Planning and Compliance
- Kind
- Investigator
- Approver
- Head of FP&A
- Code
- FIN-09
It builds budgets by line of business and tracks actuals, explaining variances in gross written premium, loss ratio, expense ratio and commission. It separates volume, rate, claims frequency, severity and catastrophe effects. **The problem it solves:** Why actuals differ from budget by line: volume, rate, frequency, severity, catastrophes or reserve movements.
How it works
6 steps, and a person signs off before step 6.
- 01Looks it up
Finds the record the request is about in the actuarial and reserving warehouse: premium, claims and expense actuals by line..
- 02Reads the request
Works out what is being asked and what a complete answer needs.
- 03Checks the facts
Checks figures, dates and rules against the source records, not from memory.
- 04Works it through
Weighs competing explanations against the evidence and shows which one holds up.
- 05Asks a person
Hands the work to Head of FP&A with its reasoning before anything goes out.
- 06Acts
Once approved, it acts in the document and correspondence system: it publishes the variance report. and records what was done.
What it works with
Your knowledge, your systems, your people.
Knows
The budget method, plan assumptions (rate change, volume, loss ratio by line), catastrophe load and variance thresholds.
Reads from
the actuarial and reserving warehouse: premium, claims and expense actuals by line.
Acts in
the document and correspondence system: it publishes the variance report.
Hands back
A list of variances, each with line, metric, budget, actual, variance and causes (a ranked list).
Asks a person when
A variance exceeds both thresholds or a reforecast is proposed.
Settings
Your limits, set by your managers.
| Setting | Default | What it controls |
|---|---|---|
| Variance threshold (%) | 5 | A line variance above this share of budget is explained. |
| Variance threshold (USD) | 100000 | A variance above this amount is explained whatever the percent. |
| Catastrophe load (% of premium) | 6 | The share of earned premium budgeted for catastrophe losses; cat losses are measured against it. |
| Reforecast after (months) | 6 | After this many months of the year the budget is reforecast. |
| Budget method | driver based | How the budget is built. |
Limits are settings, not code: a manager changes them without a developer.
Rules it always follows
- Explain variances over 5 percent or 100000.
- Split premium variance into volume and rate; split claims variance into frequency, severity, large losses and catastrophe against a 6 percent load.
- Budget with driver based.
- Reforecast after 6 months.
- Never treat reserve releases as underlying improvement.
See the Budgeting Agent agent on your own work.
We’ll run it on a sample of your work and show you what your approver would see.