Panel Tender Evaluation Agent
Runs tenders for claims panels and other services and recommends the winning bid.
- Industry
- Insure AI
- Department
- Procurement
- Team
- Sourcing and Contracts
- Kind
- Decision-maker
- Approver
- Claims Manager
- Code
- PRC-03
It runs requests for quotation and panel tenders, such as a motor repair network by region, a loss adjuster panel, a third-party claims administrator or a document printing contract, and scores each bid on price, service quality and turnaround. It checks the low bids for unrealistic labour rates or fee scales that would drive claims leakage, and recommends the award with its effect on the indemnity spend and claims turnaround.
How it works
7 steps, and a person signs off before step 7.
- 01Looks it up
Finds the record the request is about in the claims management system: the current panel's cost per claim, cycle times, leakage findings and complaint counts by region for the tendered category..
- 02Reads the request
Works out what is being asked and what a complete answer needs.
- 03Checks the facts
Checks figures, dates and rules against the source records, not from memory.
- 04Forecasts, when it decides
Projects what each option will cost or return before it recommends one.
- 05Works it through
Prepares the draft, match, recommendation or reply, with its sources.
- 06Asks a person
Hands the work to Claims Manager with its reasoning before anything goes out.
- 07Acts
Once approved, it acts in the document and correspondence system: it creates the award letter to the winner and the regret letters to the others, ready to send. and records what was done.
What it works with
Your knowledge, your systems, your people.
Knows
The tendering policy: evaluation weights, minimum bidders, panel fee scales and labour rate benchmarks by region, service level schedules and the award approval rules.
Reads from
the claims management system: the current panel's cost per claim, cycle times, leakage findings and complaint counts by region for the tendered category.
Acts in
the document and correspondence system: it creates the award letter to the winner and the regret letters to the others, ready to send.
Hands back
An object with tender_id, winner, scores (a list, each with supplier, price_score, quality_score, turnaround_score, total and compliant), low_bid_flags (a list), estimated_annual_value, forecast_leakage_change_percent (or null) and reason.
Asks a person when
The award is at or above 100000 a year, there are fewer than 3 compliant bids, the winner fails the low bid check, or it replaces an incumbent panel supplier.
Settings
Your limits, set by your managers.
| Setting | Default | What it controls |
|---|---|---|
| Weight of price (%) | 40 | Share of the score given to price. |
| Weight of service quality (%) | 35 | Share of the score given to quality, including leakage and complaint history. |
| Weight of turnaround (%) | 25 | Share of the score given to report or repair turnaround. |
| Fewest compliant bids | 3 | Fewer compliant bids than this makes the tender need the approver. |
| Low bid check below the median (%) | 20 | A bid this far below the median is checked for an unsustainable rate that could raise claims leakage. |
| Annual value that needs the approver (USD) | 100000 | An award at or above this estimated annual value needs the approver. |
Limits are settings, not code: a manager changes them without a developer.
Rules it always follows
- Score each compliant bid as 40 percent price, 35 percent quality and 25 percent turnaround, normalising price to the same basis per claim.
- A tender with fewer than 3 compliant bids is not awarded without the Claims Manager.
- A bid more than 20 percent below the median is checked for unrealistic labour rates, capped hours or exclusions that would push cost back into claims.
- A bid that rejects the claims handling service levels, the right to audit or the data protection terms is not compliant.
- An award at or above 100000 a year, or one that replaces the incumbent on a claims panel, needs the Claims Manager.
- Forecast the award's effect on indemnity spend and claims turnaround time, not only on fees.
See the Panel Tender Evaluation Agent agent on your own work.
We’ll run it on a sample of your work and show you what your approver would see.