UAE · ENBook a demo
IT CompanyEngineeringDecision-maker

Technical Debt Agent

Finds and refactors high-cost code.

Technical Debt AgentApplication Engineering
Industry
IT Company
Department
Engineering
Team
Application Engineering
Kind
Decision-maker
Approver
Engineering Manager
Code
ENG-10

It finds the code that costs most to keep on the SaaS platform and in long-running managed-services engagements, from churn, linked defects, complexity, slow builds and support hours, estimates what fixing it would save in engineering hours and USD, and ranks a refactoring backlog. It keeps debt work within the sprint capacity agreed with product or the client.

How it works

7 steps, and a person signs off before step 7.

  1. 01Looks it up

    Finds the record the request is about in the source code repository and CI/CD: churn, complexity, build times and linked defects for the repositories named..

  2. 02Reads the request

    Works out what is being asked and what a complete answer needs.

  3. 03Checks the facts

    Checks figures, dates and rules against the source records, not from memory.

  4. 04Forecasts, when it decides

    Projects what each option will cost or return before it recommends one.

  5. 05Works it through

    Prepares the draft, match, recommendation or reply, with its sources.

  6. 06Asks a person

    Hands the work to Engineering Manager with its reasoning before anything goes out.

  7. 07Acts

    Once approved, it acts in the project management tool: it creates the approved debt items in the backlog with estimates. and records what was done.

What it works with

Your knowledge, your systems, your people.

Knows

The technical debt policy: hotspot measures, cost model (blended engineering rate), sprint capacity for debt, refactoring rules and what a client must agree before debt work is billed.

Reads from

the source code repository and CI/CD: churn, complexity, build times and linked defects for the repositories named.

Acts in

the project management tool: it creates the approved debt items in the backlog with estimates.

Hands back

A ranked list of items, each with path, problem, effort_hours, saving_usd_per_sprint, payback_sprints, billable (true or false) and test_plan.

Asks a person when

The backlog takes more than 15 percent of capacity, or debt work would be billed to a client.

ApproverEngineering Manager

Settings

Your limits, set by your managers.

SettingDefaultWhat it controls
Sprint capacity for debt (%)15Debt work takes at most this share of a sprint.
Hotspot window (days)90Churn and defects are counted over this window.
Blended engineering rate (USD per hour)95Used to price the cost of debt and the saving from fixing it.
Pays back within (sprints)6Only items that pay back within this many sprints are proposed.
Billable debt work needs a change requestOnWhen on, debt work billed to a client needs an approved change request.

Limits are settings, not code: a manager changes them without a developer.

Rules it always follows

  • Count churn and defects over 90 days and price cost at 95 USD an hour.
  • Propose only items that pay back within 6 sprints.
  • Keep debt work to 15 percent of sprint capacity.
  • When on is true, debt work on a client engagement that would be billed waits for an approved change request.
  • Rank by saving per hour of effort and give each item a test plan.

See the Technical Debt Agent agent on your own work.

We’ll run it on a sample of your work and show you what your approver would see.

Technical Debt Agent · IT Company | Basinwright Industries