- Industry
- Oil & Gas
- Department
- Content
- Team
- Content Planning
- Kind
- Decision-maker
- Approver
- Head of Corporate Communications
- Code
- CON-08
It sets the topics for the next planning period from what each audience is asking: investors on capital discipline and transition, host communities on jobs and local content, fuel customers on prices and products, and recruits on careers. It proposes a ranked topic plan that fits editorial capacity and stays clear of market-sensitive and investigation topics, and once approved creates the topics on the content planning board.
How it works
7 steps, and a person signs off before step 7.
- 01Looks it up
Finds the record the request is about in the analytics warehouse: search demand, traffic and engagement by topic and audience, and the library's performance over the last two periods..
- 02Reads the request
Works out what is being asked and what a complete answer needs.
- 03Checks the facts
Checks figures, dates and rules against the source records, not from memory.
- 04Forecasts, when it decides
Projects what each option will cost or return before it recommends one.
- 05Works it through
Prepares the draft, match, recommendation or reply, with its sources.
- 06Asks a person
Hands the work to Head of Corporate Communications with its reasoning before anything goes out.
- 07Acts
Once approved, it acts in the content planning board: it creates the approved topics as planning items for the period. and records what was done.
What it works with
Your knowledge, your systems, your people.
Knows
The content strategy: audiences, content pillars (safety, operations, energy transition, communities and local content, products, careers), corporate priorities, past topic performance and editorial capacity.
Reads from
the analytics warehouse: search demand, traffic and engagement by topic and audience, and the library's performance over the last two periods.
Acts in
the content planning board: it creates the approved topics as planning items for the period.
Hands back
A ranked list of topics, each with rank, topic, pillar, kind (new or refresh), audience, demand_score (0 to 100), evidence, suggested_format, earliest_publish_date and effort.
Asks a person when
The plan adds or drops a pillar, leaves out a named priority, exceeds capacity, or includes a topic touching a host government, a partner, an incident or market-sensitive information.
Settings
Your limits, set by your managers.
| Setting | Default | What it controls |
|---|---|---|
| Most topics per period | 12 | The plan never holds more topics than this. |
| Signal origins needed to rank a topic | 2 | A topic needs demand from at least this many origins. |
| Largest share for one pillar (%) | 35 | No pillar takes more than this share. |
| Smallest share for safety (%) | 15 | Safety content always has at least this share of the plan. |
| Share kept for refreshes (%) | 25 | Updating existing pieces that are dated or losing traffic. |
| Topics never planned | commodity price forecasts, undisclosed discoveries, incidents under investigation, licence bids, host-country politics | Comma-separated. |
Limits are settings, not code: a manager changes them without a developer.
Rules it always follows
- Rank topics by demand from at least 2 origins, weighted to the named business priorities.
- Never plan a topic in commodity price forecasts, undisclosed discoveries, incidents under investigation, licence bids, host-country politics.
- Plan no more than 12 topics and never more pieces than the capacity.
- Give safety at least 15 percent and no pillar more than 35 percent.
- Keep 25 percent for refreshing pieces whose figures are out of date.
- Plan pieces about a project start-up or results only after the disclosure date.
See the Content Strategy Agent agent on your own work.
We’ll run it on a sample of your work and show you what your approver would see.