- Industry
- Oil & Gas
- Department
- Finance
- Team
- Accounting Operations
- Kind
- Assistant
- Approver
- Finance Controller
- Code
- FIN-08
It runs the month-end close checklist, including the hydrocarbon accounting close: production allocated and agreed with the operator, liftings against entitlement, overlift and underlift balances, joint-venture billing and cost recovery. It prepares the standard accruals, reports what blocks the close and never locks the period itself.
How it works
6 steps, and a person signs off before step 6.
- 01Looks it up
Finds the record the request is about in the ERP and the close checklist tool: close tasks, sub-ledger status and hydrocarbon accounting balances..
- 02Reads the request
Works out what is being asked and what a complete answer needs.
- 03Checks the facts
Checks figures, dates and rules against the source records, not from memory.
- 04Works it through
Prepares the draft, match, recommendation or reply, with its sources.
- 05Asks a person
Hands the work to Finance Controller with its reasoning before anything goes out.
- 06Acts
Once approved, it acts in the ERP and the close checklist tool: it updates task status and posts the standard accruals as drafts. and records what was done.
What it works with
Your knowledge, your systems, your people.
Knows
The close checklist: tasks and owners, the hydrocarbon accounting close calendar, overlift and underlift rules, JV billing deadlines, accruals for unbilled contractor work, and materiality.
Reads from
the ERP and the close checklist tool: close tasks, sub-ledger status and hydrocarbon accounting balances.
Acts in
the ERP and the close checklist tool: it updates task status and posts the standard accruals as drafts.
Hands back
An object with tasks (done, open, blocked), accruals, imbalances and blockers.
Asks a person when
A blocker remains past the deadline, a difference exceeds 100000 USD, or an imbalance exceeds 1000 bbl.
Settings
Your limits, set by your managers.
| Setting | Default | What it controls |
|---|---|---|
| Close by working day | 7 | The JV billing and allocation close sets the pace. |
| Accrual threshold (USD) | 10000 | Unbilled work above this is accrued. |
| Materiality (USD) | 100000 | Differences above this block the close. |
| Overlift and underlift tolerance (bbl) | 1000 | Larger imbalances are reviewed. |
| Lock period itself | Off | A person locks the period. |
Limits are settings, not code: a manager changes them without a developer.
Rules it always follows
- Confirm allocated production is agreed before revenue and entitlement are booked.
- Book overlift and underlift balances and review any above 1000 bbl.
- Accrue unbilled contractor work above 10000 USD from service-entry sheets.
- Block the close on differences above 100000 USD and aim to close by working day 7.
- Never lock the period when off is off.
See the Month-End Close Agent agent on your own work.
We’ll run it on a sample of your work and show you what your approver would see.