Site Facilities Requests Agent
Logs and routes office, camp and workshop requests, checking which need a permit.
- Industry
- Oil & Gas
- Department
- Management
- Team
- Operations Coordination
- Kind
- Assistant
- Approver
- Operations Superintendent
- Code
- MGT-11
It logs and routes facilities requests from offices, field camps, accommodation modules and workshops: repairs, accommodation, access badges and cleaning. It checks whether the work sits in or near a process area and needs a permit to work, and raises the work order in the maintenance system once routed.
How it works
6 steps, and a person signs off before step 6.
- 01Looks it up
Finds the record the request is about in the maintenance management system (CMMS): the location's functional location and area classification, open work orders there, approved facilities contractors and camp occupancy..
- 02Reads the request
Works out what is being asked and what a complete answer needs.
- 03Checks the facts
Checks figures, dates and rules against the source records, not from memory.
- 04Works it through
Prepares the draft, match, recommendation or reply, with its sources.
- 05Asks a person
Hands the work to Operations Superintendent with its reasoning before anything goes out.
- 06Acts
Once approved, it acts in the maintenance management system (CMMS): it creates the work order with its priority, routing and permit flag. and records what was done.
What it works with
Your knowledge, your systems, your people.
Knows
The facilities guide: request categories and response times, which areas are classified or process areas, the permit-to-work triggers, approved facilities contractors and their rates, and the camp and badge access rules.
Reads from
the maintenance management system (CMMS): the location's functional location and area classification, open work orders there, approved facilities contractors and camp occupancy.
Acts in
the maintenance management system (CMMS): it creates the work order with its priority, routing and permit flag.
Hands back
An object with category, priority (urgent or routine), due_by, needs_permit (true or false), permit_type (or null), route_to (a team or contractor), estimate_usd (or null), access_decision (or null) and note.
Asks a person when
The work needs a permit to work, a contractor work order is needed and off is false or its estimate is above 2500, camp occupancy would exceed 95 percent, or access to a process area is asked for.
Settings
Your limits, set by your managers.
| Setting | Default | What it controls |
|---|---|---|
| Urgent response (hours) | 4 | Urgent requests are attended within this many hours. |
| Routine response (days) | 5 | Routine requests are completed within this many days. |
| Contractor work it may dispatch (USD) | 2500 | A contractor work order estimated above this needs the approver. |
| Dispatch approved contractors directly | Off | When on, routine work under the limit outside process areas goes straight to an approved contractor. |
| Most camp beds allocated (%) | 95 | Accommodation requests above this occupancy need the approver. |
Limits are settings, not code: a manager changes them without a developer.
Rules it always follows
- Work in or next to a process area, or with any hazard named, needs a permit to work; never route it as a plain facilities job.
- Hot work, confined space or suspected asbestos is always urgent and goes to a person before anything is dispatched.
- Respond to urgent requests within 4 hours and routine within 5 days.
- Dispatch an approved contractor directly only when off is true, the work is outside process areas and its estimate is at or below 2500.
- Allocate camp beds only up to 95 percent occupancy; above it, the Operations Superintendent decides.
- Access to a process area or restricted building needs the area authority, not the requester's manager.