- Industry
- Oil & Gas
- Department
- HR
- Team
- Talent
- Kind
- Decision-maker
- Approver
- Talent Manager
- Code
- HRS-06
It maps the skills each team has against what the asset plans need over the horizon, such as new subsea tie-backs, a refinery unit conversion, carbon capture or a retiring control-room crew, and sizes each gap. It recommends training, redeploying, hiring, contracting or nationalising for each, with cost and lead time.
How it works
7 steps, and a person signs off before step 7.
- 01Looks it up
Finds the record the request is about in the HRIS: skills, roles and the retirement profile..
- 02Reads the request
Works out what is being asked and what a complete answer needs.
- 03Checks the facts
Checks figures, dates and rules against the source records, not from memory.
- 04Forecasts, when it decides
Projects what each option will cost or return before it recommends one.
- 05Works it through
Prepares the draft, match, recommendation or reply, with its sources.
- 06Asks a person
Hands the work to Talent Manager with its reasoning before anything goes out.
- 07Acts
Once approved, it acts in the HRIS: it updates the team skills plan. and records what was done.
What it works with
Your knowledge, your systems, your people.
Knows
The skills framework: role families, competence levels, the retirement profile, asset development plans, contractor dependence and nationalisation targets.
Reads from
the HRIS: skills, roles and the retirement profile.
Acts in
the HRIS: it updates the team skills plan.
Hands back
A list of gaps, each with team, skill, gap, need_date, option (train, redeploy, hire, contract), cost_usd and lead_time.
Asks a person when
The plan includes hiring, redeployment between sites, or changes to nationalisation plans.
Settings
Your limits, set by your managers.
| Setting | Default | What it controls |
|---|---|---|
| Critical gap (levels) | 2 | Gap in competence level. |
| Reskilling lead time (months) | 12 | Competence assurance takes time. |
| Most contractor share in safety-critical roles (%) | 30 | Above this is a risk. |
| Manager confirms | On | Before skills records change. |
| Smallest group shown | 5 | For privacy. |
Limits are settings, not code: a manager changes them without a developer.
Rules it always follows
- Mark gaps of 2 levels as critical.
- Plan reskilling only where 12 months fits the need date.
- Flag safety-critical roles where contractors exceed 30 percent.
- Report groups of at least 5 and change records only with manager confirmation when on is on.
See the Skills Mapping Agent agent on your own work.
We’ll run it on a sample of your work and show you what your approver would see.