UAE · ENBook a demo
Oil & GasManagementDecision-maker

Crew and Resource Allocation Agent

Matches engineers, rotational crews and budget to projects, campaigns and turnarounds.

Crew and Resource Allocation AgentResource Allocation Agent · Project Delivery
Industry
Oil & Gas
Department
Management
Team
Project Delivery
Kind
Decision-maker
Approver
Asset Manager
Code
MGT-04

It matches engineers, rotational field crews and contractor teams to projects, well campaigns and turnarounds by competence, certification and rotation, within the beds or seats each site allows. It forecasts what the allocation leaves short and moves people and budget once approved.

How it works

7 steps, and a person signs off before step 7.

  1. 01Looks it up

    Finds the record the request is about in the contractor management portal: the competence and certification records, current assignments and rotations of the people and contractor crews named, and the framework call-off rates..

  2. 02Reads the request

    Works out what is being asked and what a complete answer needs.

  3. 03Checks the facts

    Checks figures, dates and rules against the source records, not from memory.

  4. 04Forecasts, when it decides

    Projects what each option will cost or return before it recommends one.

  5. 05Works it through

    Prepares the draft, match, recommendation or reply, with its sources.

  6. 06Asks a person

    Hands the work to Asset Manager with its reasoning before anything goes out.

  7. 07Acts

    Once approved, it acts in the ERP's finance, maintenance and supply modules: it updates the project resource assignments and posts the approved budget transfers and contractor call-offs. and records what was done.

What it works with

Your knowledge, your systems, your people.

Knows

The resourcing rules: competence and certification requirements by role, rotation patterns, persons-on-board and camp limits by site, the project priority list, contractor call-off terms and the budget transfer policy.

Reads from

the contractor management portal: the competence and certification records, current assignments and rotations of the people and contractor crews named, and the framework call-off rates.

Acts in

the ERP's finance, maintenance and supply modules: it updates the project resource assignments and posts the approved budget transfers and contractor call-offs.

Hands back

An object with assignments (a list, each with person, project, site, role, start, end, rotation and competence_match_percent), shortfalls (a list, each with project, role, people_short and effect), contractor_calloffs (a list, each with contractor, role, people and cost_usd), budget_moves (a list, each with from_project, to_project and amount_usd) and site_loading (a list, each with site, planned and limit).

Asks a person when

It moves someone off a live operation or turnaround, moves budget of 250000 or more, proposes a contractor call-off, assigns below 80 percent competence match, or leaves safety and integrity work short.

ApproverAsset Manager

Settings

Your limits, set by your managers.

SettingDefaultWhat it controls
Most a person is planned (%)100No one is planned above this across their assignments.
Lowest competence match for a role (%)80A person matching less of a role's competence profile is not assigned without the approver.
Budget move that needs approval (USD)250000Moving this much or more between projects needs the approver.
Priority when demand exceeds supplysafety and integrity, production, projectsThe order in which short demand is filled.
May propose contractor call-offsOnWhen on, unmet demand may be filled by a call-off under an existing contractor framework.
Certification must be valid for (days after the end)14A person whose safety certification expires within this many days of the assignment end is not assigned.

Limits are settings, not code: a manager changes them without a developer.

Rules it always follows

  • Assign only people whose safety and role certifications stay valid 14 days past the assignment end, and who match at least 80 percent of the role's competence profile.
  • Never exceed a site's beds or persons-on-board limit; extra demand waits for a later rotation or goes to the Asset Manager.
  • Respect each person's rotation; no one is planned above 100 percent or into their field break.
  • When demand exceeds supply, fill it in the order safety and integrity, production, projects, and say what is left short and its effect.
  • Propose a contractor call-off only when on is true and only under an existing framework with a pre-qualified contractor.
  • A budget move of 250000 or more between projects needs the Asset Manager.

See the Crew and Resource Allocation Agent agent on your own work.

We’ll run it on a sample of your work and show you what your approver would see.

Crew and Resource Allocation Agent · Oil & Gas | Basinwright Industries