UAE · ENBook a demo
Oil & GasManagementDecision-maker

Project and Asset Risk Agent

Keeps project and asset risk registers, barriers and mitigations current.

Project and Asset Risk AgentRisk Tracking Agent · Project Delivery
Industry
Oil & Gas
Department
Management
Team
Project Delivery
Kind
Decision-maker
Approver
Asset Manager
Code
MGT-05

It keeps the risk registers of capital projects and operating assets current: it scores new and changed risks on the company risk matrix, checks each process-safety risk against its barriers, and chases overdue mitigations. It decides which risks to escalate, accept or close and updates the register once approved.

How it works

7 steps, and a person signs off before step 7.

  1. 01Looks it up

    Finds the record the request is about in the HSE incident management system: the risk register entries, barrier status, open mitigations and recent incidents linked to the project or asset named..

  2. 02Reads the request

    Works out what is being asked and what a complete answer needs.

  3. 03Checks the facts

    Checks figures, dates and rules against the source records, not from memory.

  4. 04Forecasts, when it decides

    Projects what each option will cost or return before it recommends one.

  5. 05Works it through

    Prepares the draft, match, recommendation or reply, with its sources.

  6. 06Asks a person

    Hands the work to Asset Manager with its reasoning before anything goes out.

  7. 07Acts

    Once approved, it acts in the HSE incident management system: it updates the risk register scores, owners, mitigations and status once approved. and records what was done.

What it works with

Your knowledge, your systems, your people.

Knows

The risk management standard: the 5x5 risk matrix, risk appetite by category, the ALARP test, barrier and bowtie definitions for major accident hazards, and the review cycle.

Reads from

the HSE incident management system: the risk register entries, barrier status, open mitigations and recent incidents linked to the project or asset named.

Acts in

the HSE incident management system: it updates the risk register scores, owners, mitigations and status once approved.

Hands back

An object with risks (a list, each with id, title, category, likelihood, consequence, score, previous_score, owner, barriers (a list with barrier and status), mitigations (a list with action, due and status) and decision (keep, escalate, accept, close or rescore)), escalations (a list, each with id and reason), stale (a list of ids) and became_issues (a list of ids).

Asks a person when

A risk is at or above 15, a major accident hazard has a degraded or failed barrier, it proposes to accept a risk outside the averse appetite or to close any risk, or a risk has become an issue.

ApproverAsset Manager

Settings

Your limits, set by your managers.

SettingDefaultWhat it controls
Score that goes to the approver15A risk scoring this or more on the 5x5 matrix is escalated.
Highest score that may be closed4Only risks at or below this residual score may be proposed for closure.
Mitigation overdue after (days)14A mitigation this many days past its due date is flagged and its risk rescored.
Risk appetiteaverseThe appetite the register is tested against; process-safety risks are always averse.
Review each risk every (days)30A risk not reviewed within this many days is flagged as stale.
Escalate a degraded barrierOnWhen on, any major accident hazard with a degraded or failed barrier is escalated whatever its score.

Limits are settings, not code: a manager changes them without a developer.

Rules it always follows

  • Score every risk as likelihood times consequence on the 5x5 matrix; a missing figure is asked for, never assumed.
  • Escalate a risk at or above 15 to the Asset Manager; when on is true, also any major accident hazard with a degraded or failed barrier.
  • Process-safety and environmental risks are always tested as averse, whatever the averse setting, and are never accepted without an ALARP case.
  • Propose closure only for risks at or below 4 residual with evidence the mitigation is in place.
  • A mitigation 14 days overdue raises the risk's likelihood back to its pre-mitigation score.
  • Flag a risk not reviewed within 30 days as stale and name its owner.

See the Project and Asset Risk Agent agent on your own work.

We’ll run it on a sample of your work and show you what your approver would see.